Specification approach.
Concrete and clay tile can outlast the underlayment beneath it. In Cave Creek, the underlayment is the component that needs the most serious specification.
We remove, inspect, replace, and reinstall to a written standard, with special attention to south elevations, ridge exposure, hips, valleys, and penetrations.
What the written scope covers
- Roof assembly and material specification
- Underlayment, flashing, and ventilation notes
- Exposure and lot-specific observations
- Photographic documentation requirements
- Warranty and closeout documentation
- Permit and inspection assumptions

